24 hour emergency electrician Typical response 1 hour across Canterbury 07366 354 116

Fixed prices in writing

22kW Three-Phase EV Charging in Canterbury

We install 22kW three-phase EV chargers across Canterbury from a fixed written price, covering labour, materials, testing and certification. A 22kW unit needs a suitable three-phase supply, around 32A per phase, correct earthing and a car capable of accepting 22kW AC. We survey your consumer unit, cable route and parking arrangement first, then coordinate with UK Power Networks if needed. The sections below explain costs, grants, installation steps and local site considerations.

Wall-mounted EV chargepoint fitted to the outside of a brick house
EV chargepoint installation
  • NICEIC approved
  • Part P registered
  • £5m public liability
  • 12-month workmanship guarantee
  • Fixed price before we start
22kW Three-Phase EV Charging in Canterbury

What an EV charger costs to install in Canterbury

From £1,000 fitted — a home EV chargepoint in Canterbury typically costs £1,000 installed, including VAT, parts, labour, testing and certification. We’ll assess your consumer unit, earthing, cable route and socket compatibility before fitting an EV charger safely.

Job Price What’s included
Home chargepoint From £1,000 Parts, labour, testing, certificate, VAT
Fault finding £80/hr Electrical investigation
Consumer unit £500–£700 Replacement, testing, certification
Extra socket £55–£75 Parts, labour, testing, VAT
Supply assessment Quoted per job after a free survey Three-phase capacity review

For Canterbury properties, the installation timeline depends on route length and supply condition. A 22kW unit needs three-phase capacity; any grid upgrade is separate and DNO charges aren’t included. We’ll identify safety requirements before work begins.

Grants available right now

Although a 22 kW installation may require separate network‑upgrade work, eligible Canterbury residents can currently apply for an OZEV grant of up to £500 per socket for domestic chargepoints. The scheme rate is set from 1 April 2026 and, at the time of writing, the programme is scheduled to run until 31 March 2027; future funding and end‑dates are decided by government and may change.

Grant eligibility is limited: it covers flat owners and tenants with private off‑street parking and landlords in qualifying circumstances, while most owner‑occupied houses do not qualify. (A common misconception is that all homeowners automatically qualify; in fact entitlement depends on tenancy/ownership status and parking arrangements.) We will confirm your tenure, parking arrangements and proposed installation before relying on grant funding in any written quotation.

Installer authorisation is required for a claim: the contractor who submits the claim must be OZEV‑approved, and you should not assume an installation by an unapproved installer will be eligible for the grant. (It is sometimes thought that simply using a competent electrician is sufficient; the actual requirement is that the installer is authorised to make the OZEV claim.) Check the scheme each April or before booking, because eligibility criteria and funding levels can change.

Which charger suits your home

The right chargepoint for a Canterbury home depends on your vehicle, daily mileage, parking layout and electrical supply—not simply the highest advertised kW rating. We’ll match charging capacity to the car’s onboard charger and verify the incoming supply, particularly in older Wincheap terraces or post-war estates with aluminium wiring.

Home factor Suitable approach
Single-phase supply 7kW chargepoint
Three-phase supply 11kW or 22kW, vehicle permitting
Overnight parking Smart 7kW is usually sufficient
Two EVs Load-managed dual charging
Future vehicle change Future proofing installation

High current compatibility matters: a 22kW unit requires three-phase capacity and appropriate protective devices, but many cars cannot accept 22kW AC. We’ll also consider cable routing, weather exposure and secure positioning, ensuring the chargepoint suits your driveway without overloading the consumer unit.

What is involved on the day

On installation day, we’ll isolate the relevant circuits, confirm the agreed cable route and test the supply before fitting your 22kW three-phase chargepoint. Please make sure site preparation is complete: clear access to the parking position, consumer unit and proposed cable path helps us work safely and efficiently.

We’ll mount the chargepoint, install suitably protected cabling, make secure terminations and label the new circuit. Our testing procedures include continuity, insulation resistance, polarity, earth-fault loop impedance and functional checks of the chargepoint’s safety features. We’ll then demonstrate operation, explain any app setup, provide certification and leave the work area tidy. Your fixed written price remains unchanged.

Whether your supply can take it

Before fitting a 22kW chargepoint, we’ll confirm that your property has a suitable three-phase supply and enough spare capacity on each phase. Our supply assessment checks the service head, meter arrangement, main protective devices, consumer unit rating, earthing and existing demand from appliances such as electric heating, showers and workshops.

A 22kW unit can draw 32A per phase continuously, so balance matters: an overloaded phase can cause overheating, nuisance tripping or unsafe equipment operation. We’ll also check the installation against current wiring regulations and identify any ageing wiring, particularly in Canterbury’s Victorian terraces or post-war homes.

If capacity is limited, we’ll explain whether load management, a lower-rated chargepoint or a Distribution Network Operator load upgrade is required. Any upgrade must be agreed before installation, not assumed.

Driveways, garages and on-street parking in Canterbury

Parking location shapes the safe design of a 22 kW chargepoint installation in Canterbury, and we tailor our approach to the town’s specific neighbourhoods. In these neighbourhoods we also consider driveway aesthetics, concealing containment where practical while making sure the isolation switch and overcurrent protection remain readily accessible.

In older areas of Wincheap and central Canterbury, where Victorian and early 20th‑century properties often have unclear or historic wiring routes, we take particular care and may recommend mechanical protection for any surface cable runs.

Certificates and DNO notification

For a compliant 22 kW three-phase chargepoint installation in Canterbury, we issue the appropriate electrical certification after testing and notify the distribution network operator where required. Our compliance certificates record inspection, test results, protective-device arrangements, earthing provisions and chargepoint circuit details. They provide evidence that the work meets BS 7671 and is suitable for your installation.

We follow the relevant notification procedures before or after connection, depending on the supply arrangement and network requirements. This is particularly important where a property’s existing three-phase capacity, service equipment or maximum demand needs review. We’ll check that the consumer unit, isolators and cabling are correctly rated and labelled, then submit the necessary information to UK Power Networks where applicable. You’ll receive the completed certification for your records, insurance and future electrical work.

What it costs

JobWhat is includedPrice inc. VAT
EV chargepoint, fittedAbout £500 after the OZEV grant where you qualifyfrom £1,000
Consumer unit (fuse box) replacementBoard, RCBO/RCD protection, testing, certificate£500–£700
Extra socketSupply, fitting and testing£55–£75
EICR, up to 3-bedFull inspection, test results and report£150–£250
Fault findingMost faults traced in 1–2 hours£80/hr

All prices include VAT, parts, labour, testing and the certificate. Not included: making good plaster and decoration, asbestos removal, DNO charges for a supply upgrade, scaffold or access equipment. Fixed price in writing before we start — the bill is never larger than the quote.

Frequently asked questions

1) Will a 22 kW home charger work with my electric car?

No — many cars only accept 7 kW or 11 kW AC charging. We’ll match the chargepoint to your car and future needs so you get the right speed.

2) How long will an installed charger last?

10+ years — there’s no fixed lifespan; it depends on installation quality, enclosure, cable routing and maintenance. Proper installation and weatherproofing extend life.

3) Do I need the electricity company to be told about my charger?

Yes — certification and any DNO notification must be completed where required to ensure your supply can handle the extra load safely and legally.

4) Will charging overload my home when my oven or heat pump is on?

Yes — possibly, unless we use load balancing. Load balancing reduces charging automatically when big appliances run to prevent supply overload.

5) Can you install a charger in an older terrace or flood-prone house?

Yes — we’ll inspect wiring, mounting options and flood risk and use appropriate protection and mounting for Victorian terraces or post-war and flood-prone homes.

6) Do outdoor chargers need special weatherproofing and earthing?

Yes — outdoor locations need weatherproof enclosures, correct earthing and protective devices to keep the installation safe and compliant.

Get a fixed price

Get a fixed written price for your 22 kW three-phase chargepoint installation in Canterbury before work starts. We’ll survey the supply, consumer unit capacity, earthing arrangement, cable route and chargepoint location, then provide a written quote covering labour, materials, testing and certification. Our fixed price won’t increase unless you approve a clearly identified change, such as remedial work revealed during safe isolation or excavation.

Call 07366 354 116 · 24hr